Millrace Works — plant & panels

5 Loc8IDs

One factory, a dozen bits of kit. Pin the compressor room, the main panel, the roof units — so a service call starts at the asset, not the gatehouse.

Gatehouse / sign-in

X6ZP

Report to the gatehouse for a permit.

Main distribution panel

9ZP9

MDB in the switch room, west wall.

Compressor room

21F3

Air compressors and dryer.

Rooftop units — RTU 1-3

6CKM

Three rooftop units above Bay 2.

Meter room

V2NT

Utility meters (gas / water / electric).