Harbor Tower — service access

5 Loc8IDs

Where a field engineer actually needs to be — the rooftop plant, the electrical room, the goods lift — not the front lobby. Each pinned to the metre with access notes.

Service entrance

JDNZ

Loading-side door on Level P1 — not the main lobby.

Goods lift

SKZT

Freight lift up to the plant deck.

Rooftop plant — AHU-4

31G3

Air-handling unit 4, north-east corner of the roof.

Main electrical room

11VT

Level B2, room B2-14.

Riser cupboard · L12

ZJNQ

Comms / riser cupboard on floor 12.